Bathroom's Done, Closing The Shop For A Couple Of Months

Mar 20, 2021 3 Replies

I finished the bathroom remodel and now I'm closing the shop for a couple of months. I'm having rotator cuff surgery on Monday.



6 - 8 weeks in a sling, right (primary) arm.

I had bicep tendon surgery on the same arm about 10 years ago so I'm familiar with the overall process, PT, etc. There is some indication that I'll need the left shoulder done at some point but I've got a complete tear on the right side that's really crimping my style. I just spent the day putting the winter stuff away and getting the summer stuff out. I?m pretty sore right now.



I got the bathroom done just in time. It's a basement bathroom, mostly used by me, so I decided on a wood motif. Always wanted a room like that. Flat pine trim and matching accessories. Sort of a rustic, cabin like feel. The accessories were the last shop project for a while. I need a new toilet-side table, but that's going to wait until I open up the shop again.



Medicine Cabinet:

formatting link
TP Holder and Robe Hooks:
formatting link
Trim and floor:
formatting link
Oh yeah - I scored a $200 Cold Therapy machine for $40 on Craigslist. The cooler/pump portion is $150, the shoulder pad adds $50. The one on Craigslist just happened to come with the shoulder pad. Sweet!



formatting link


Remodel grade: 75% Medicine cabinet opens to left. Check! You screwed up with your right handed TP dispenser. You gonna have trouble, maybe. X ! Floor & trim looks very nice. Check!

Sonny

I practiced with my left. It's all good. There's a sink in the bathroom, under the medicine cabinet. I'll get the left hand fingers clean. ;-)

I like the matching grain on the second shelf. Nice touch.

Too blond for Oak. Ash?

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required