In the image link the current waste appears to be messy, it uses a flexi pipe bent round to 90% and then to the soil stack. The inset shows what I think would be better which is a solid 90% bend and then flexi to adjust the length. The original flexi is also preventing me from making the cistern directly attached to the wall I will have to use a batten after I have tiled there, which hopefully with the inset I wouldnt need to do thi.
Any thoughts or better ideas.