I’ve seen too many guys walk onto a job site claiming they can handle a trowel only to leave a mess that costs more to grind down than the original pour cost. When you bring someone new on, the first thing you have to watch is thier timing on the edges. A lot of rookies get nervous and start pulling the edger way too early when the cream is still too wet, or they wait until it's set up so hard they're basically fighting rocks. You need to pull them aside and show them how to feel for that perfect resistance before they touch the slab. It’s also about the tools they bring. If a guy shows up without a magnesium float or his own sliders, that is a massive red flag. I always tell the new hires to keep their eyes on the slurry consistency. If you see them trying to add water to the surface to make it easier to work, stop them immediatly. It kills the PSI and ruins the finish long-term. Just keep them on the simple tasks like pulling the screed for the first few pours until you’re sure they have the feel for how the mix is reacting to the heat that day.


I started putting new guys on the screed first last summer after seeing a couple of slabs get ruined by premature edging. It definitely helps you gauge thier stamina and if they acutally understand how the mud moves before they get a chance to mess up the finish. I had one guy who talked a big game but couldn't keep a consistent pace with the 12-foot screed on a simple garage floor. He was gassed by the time we were halfway through, wich told me everything I needed to know about his expirience level.

I’m with you on the tools, too. I look for a well-worn Marshalltown mag float in their bucket. If their gear looks brand new or they're asking to borrow my knee sliders, I know I'm in for a long day. One thing I’ve started doing is checking their boots. If they aren't wearing proper work boots that can handle a bit of slurry, they usually aren't ready for the reality of a big pour.

The water trick is the worst habit to break. I caught a new hire trying to spray a mist over a section of a 3,500 PSI patio because the sun was hitting it hard. I had to explain that if he can't work the cream that's there, he shouldn't be on the slab. It’s better to have them pulling the rake or handling the vibrator until they respect the chemistry of the mix.

That bit about the worn gear is the truth. I'll take a guy with a rusted-handle mag over a shiny new kit any day. One thing I always look for that gets overlooked is how they handle the washout. If they’re lazy about cleaning thier tools before the mud kicks, they’re going to be lazy about the details in the finish. You can tell alot about a guy's discipline by looking at his bucket at the end of the shift. If it's caked in dry slurry, he’s not the one for a high-end job.

Spot on about the gear. I usually tell the greenhorns that if they want to be taken seriously, they better have a Kraft Tool Co. 16-inch magnesium float in their bucket. It’s the gold standard for a reason. If they show up with some no-name plastic junk, I know they aren't thinking about the cream or the finish. I’ve also found that making them use a Chapin industrial sprayer for curing compound is a great test. If they can’t handle a consistent spray pattern without clogging the tip, there’s no way I’m letting them touch a power trowel later.