Been meaning to share this for a while since I keep forgetting to post the good jobs. Did a patio recently with a circle joint around a fire pit cutout and it came out pretty clean, so figured I'd pass along a few things I learned the hard way over the years. One big one: walk the whole layout on your forming day, not after the pour. I eyeballed a line once that looked fine against the forms, but once the circle went in the middle of the slab it wandered all over the place. Too late to fix by then. Now I stake out the center point, build a simple swinging bar for the radius, and snap every arc before concrete ever shows up. Also, mark your straight joints where they meet the circle so the crew knows exactly where to cut. A little chalk tick at each intersection saves a lot of arguing on pour day. And check your work from up high if you can, a ladder or even the roof, because wierd kinks that hide at ground level stick out like a sore thumb from above. Ten minutes of checking beats living with a crooked line for twenty years.


I had a similar expirience when setting up a kidney shaped foundation for a small shed last year. The method of marking the intersections where the straight forms meet the curved ones is critical. I used a simple 3/8 inch marking paint on the stakes themselves rather than just chalk to make sure the concrete crew could see them from a distance even when the mixer arrived. This kept the entire layout from having to be redone once the forms were set.

For the circular joint specifically, I found that setting the initial batter on the outer edge first really helped. Once the perimeter was marked, I used the swinging bar to plot interior reference lines at 12 inch increments. Having those interior guides made it much easier to determine where the necessery cuts needed to happen. It made the pour feel much smoother than trying to figure out the angles on the fly. The whole thing ussually takes longer to set up than the pour itself, but it saves a headache later.

I also found that checking the slope from higher ground was very helpful, even for just a small patio. A slight tilt that looks fine when you are standing on it can cause significant pooling when the rain comes. It’s just good practice to make sure that the entire slab is graded correctly before the finishers show up.

Not sold on plotting interior reference lines every foot like you described. On a small slab that just clutters everthing up, and I've watched a crew follow the wrong snapped line because there were too many of them. I mark only the actual cut lines and leave the rest bare. One job I did with a curved driveway apron, I snapped maybe four lines total and it went fine. Extra guides sound helpful in your head but on pour day with mud everywhere, less to read is better.

This might be a dumb question but when you say joints, do you mean the lines that get cut into the concrete after it dries so it cracks there instead of randomly? I only ask beacuse we just had a driveway done and there are grooves everywhere and now I'm wondering if that's what they were for. Also that swinging bar thing sounds like something I could rig up with a stick and a nail, or is there more to it than that? Trying to picture how you keep it from wobbling all over the place.