With the mahogany TV/Mantle cabinet completed and delivered I was able to go back to the boxes.
I had six boxes, remaining from the eight total, to sand and finish, Plus 204 small top pieces to round over the edges, sand the round over on all sides of those pieces, apply 3 coats of finish and finally buff to smooth all of those pieces including the round overs. Last step glue those pieces in place. Amazingly none of those 204 pieces disappeared during the 4~5 week rest and finishing period.
Counting the box sides, tops and bottoms, domino's in the corners joints and the small top pieces each box had 44 pieces of wood and or 352 pieces for all 8 boxes.
All total there were 8 boxes. Two had to be be completed 7 weeks ago.