I have been in discussion with a Project Surveyor of a certain London Borough with regards to some 'jobs' I need done around my bathroom. I am suspicious the advice he has given is incorrect (not based on my opinion, but articles on the web from the ODPM, NICIEC), I would appreciate some advice.
Do I need Building Regulations approval with regards to Part P. The Electrical work would be carried comply with BS 7671: 2001, and the boiler has already been installed by a Corgi Registered Installer. For each of the following jobs:
- replace an existing boiler in a Bathroom
- replace a Shaver Socket in a Bathroom
- earth bonding in a Bathroom
thanks gna