Hi all. The lead supply pipe is under the hall floorboards and then disappears inder the concrete floor in the kitchen for a distance of about 9 feet. When I replace the lead water supply pipes with MDPE, will I have to bury it or can I let it lie on the kitchen floor behind the base units.?
Or should I cut the mdpe when it reaches the kitchen and connect it to copper? Oh and 15mm or 22mm?
Thanks.
Arthur.