I have just lifted out the old shower tray and although it was layed on weak concrete mix this was straight on to the wooden floorboards, the rest of the floor was tiled on 5 mm ply. When I come to lay the new shower tray & tiles should I also lay ply under the shower tray area befor I lay the concrete mix?
- posted
8 years ago