Ensuring proper slope

Aug 10, 2003 3 Replies

I am laying down DWV piping under concrete slab. How do I ensure proper constant slope from a fixture to main stack? There are a lot of fittings used.


If it's in a straight line, lay a long 2 X 4 along the pipe to ensure the run is reasonably straight. You want approx 1/4" per foot slope. Mark your level at the

1 foot length and tape a 1/4" shim there and you can check individual sections.

Jim

OR you could just use an angle finder at or about 40 degrees is what most building codes for. Terry Lewis Contracting