So my hot tub feed came up short. Not by much, maybe 4 or 5 feet, but enough that the electrician wants to splice on the extra length inside a box up in the attic instead of running a fresh piece from the panel all the way out. Here's where I'm torn. Part of me says a proper splice in a proper box is fine and guys do it all the time. The other part of me thinks for something feeding a hot tub, with the pump and heater running for hours at a time, I'd rather have one unbroken piece of wire and zero extra connections to ever worry about.
Then there's the attic question itself. Hot up there in summer, cold in winter, and how easy is it to even get at that box later if something needs checking? I've also heard boxes are supposed to be reachable, not buried under a pile of insulation where you need a treasure map to find them. Curious where people land on this. Is a splice fine if it's done right, or whould you tell the guy to pull new wire and eat the cost of his measuring mistake?