Always used mesh sheets on my previous pours, mostly beacuse that's what the local supplier stocks and it's what everyone around here does. This time I had a heap of leftover 12mm bars sitting in the shed from a fencing job, so I figured I'd tie them into a grid instead for the new shed slab. Took way longer than I expected, honestly. Cutting, bending, spacing it all out on chairs, tying every intersection. Mesh you just roll out and you're half done.
But once the concrete went down it felt like a diferent pour. I could walk on the bar mat without it moving around, whereas I've always had to be careful not to kick mesh up off its chairs mid-pour and end up with it sitting on the ground doing nothing. My concreter mate reckons the bar does a better job in the slab body too since you can position it properly instead of guessing where the sheet ended up after you screed.
Still not sure the extra couple of hours was worth it for a shed floor, but for the driveway I'm doing next year I'd probaly tie bar again. Different tools for different jobs I suppose.