Just finished pouring a new entryway ramp at our church last week, first time doing anything this size on my own. Broom finish came out better than I expected and I tooled the joints in the same day like the older guy who was helping me said. Put caution tape and a few cones across the front so nobody walks on it.
My question is about timing. Some people at the church are pushing to take the tape down already since it looks done, but I keep reading that concrete keeps curing way longer than it feels like it does. Is a week enugh before regular foot traffic, or should I hold out longer? Also there's a gap of loose dirt around the edges where I dug out for the forms. Should I backfill that now or wait until the slab has fully cured?
One more thing, I taped plastic sheeting over the brick pillar next to the door to keep splatter off the paint. Is there any trick to pulling that without leaving dried bits of cement stuck to the brick face? Didn't think that part through before I covered it, kind of learning as I go here.