Spent the last three weeks on the entry pillars and finally got the driveway apron poured this weekend. Total relief honestly. The pillars were the part I kept second-guessing because board-formed concrete shows every single mistake. One wavy board and you see it forever. I clamped everything tight and sealed the joints with tape on the inside, which kept most of the grout bleed from streaking the faces.
Stripping the forms was the best moment of the whole project. Clean crisp lines, the horizontal board pattern came out better than I expected. A couple of small honeycombs near the bottom of one pillar where the concrete didn't quite fill against the form, nothing a little slurry won't hide.
The flatwork went down in one long day with a friend helping. Scored it into big square slabs so it reads like pavers once it cures. Kept it damp and covered since the sun was brutal that afternoon. All concrete on our end, zero wood except the forms themselves, which came off two days ago and are stacked in the garage waiting to be reused on the gate posts. Not looking forward to saw-cutting the control joints, but that's next weekend's problem.