How much finishing work is actually necessary before I can just go home?

May 07, 2026 Last reply: 2 months ago 5 Replies

My back is absolutely killing me and I've been out here since six this morning trying to get this back patio leveled out. I thougt I coud handle a 12x15 slab on my own. But the transit mix truck showed up earlier than expected and now the slump feels like it's setting up way faster than I can keep up with. I'm honestly at the point where I just want to throw the tools in the garage and head inside. I've done the initial screeding and hit it with the bull float once, but it still looks a little rough in the far corner near the house. Do I relly need to wait around for the bleed water to disappear and hit it with the steel trowel if it's just going under a rug anyway? Every muscle in my legs is cramping up and my wife keeps asking when we can finally eat dinner. If I leave it with a slightly textured finish instead of that smooth glass look, am I going to regret it in five years? I'm just ready to be done.


Trying to get a glass-smooth finish on an outdoor slab is usually a mistake. Steel troweling densifies the surface too much for exterior work, wich traps moisture and air. In a couple of winters, that pretty surface will start scaling and flaking because the water has nowhere to go during a freeze-thaw cycle. You’ll end up with a pitted mess that looks way worse than a slightly rough corner near the house. Since your back is shot and the mix is setting up, stop worrying about the steel trowel. If you've alredy bull floated it, you're most of the way there. That rough corner can be touched up with a **magnesium float** and a tiny bit of water if it’s relly bothering you, but don't overwork it. Pushing the cream around too much when the slab is already stiffening just weakens the top layer and leads to dusting later on. And honestly, if you're exhausted, just leave it. As for the rug, you need to be patient. Throwing an outdoor rug over a slab that hasn't fully cured is a recipe for permanent discoloration. The concrete needs to breathe while it hydrates over the next month. If you cover it now, you’re going to have a dark, splotchy mess under that rug that won't ever dry out properly. Just run a shop broom across it once the bleed water is gone and go eat dinner. A **broom finish** is the standard for a reason. It hides those minor imperfections from your screeding and gives you enugh traction so nobody slips when the patio gets wet. You won't regret having a bit of texture in five years, but you’ll defintely regret a slick surface that starts peeling.

I'm terrified of the broom finish timing. I tried a small walkway last month and waited til the bleed water was gone, but it still felt like I was just dragging mud around. Does the broom itself need to be wet or dry when you pull it across? I’m also wondering about the rug part. If I wait the full month for it to cure, shold I put a sealer on it before the rug goes down? My neighbor put a mat on his new porch after two weeks and it left a permanent outline. This stuff is way more temperamental than I thougth.

Keep that broom damp but not dripping. If it’s bone dry, the bristles will grab the aggregate and leave a mess. Just dip it in a bucket and give it a good shake before each pass across the slab. On the sealer question, you defintely want a penetrating sealer before the rug goes down. Even after a month, rugs trap vapor. Without a silane-siloxane sealer, you'll end up with nasty efflorescence—those white chalky mineral deposits—blooming right under the mat. It’s a total pain to scrub off once it sets in, so don't skip that step.

Don't forget to run your edger one last time before you call it a night. If you leave the edges raw, they’ll chip away within a year and look like junk. It only takes five minutes and makes the whole slab look like a pro did it, even if that corner is a bit wonky. Also, if you're that beat, just rent a gas-powered saw tomorrow or the day after to cut your control joints. Don't try to tool them in now if the mix is alredy fighting you. Just get some rest, eat that dinner, and handle the joints once you can acutally stand up straight again.

Make sure you don't collapse on the couch before rinsing your tools. If that mix is already stiffening, it’ll be a nightmare to scrape off your float and screed tomorrow. On the saw cuts, if you're renting a walk-behind or using a diamond blade on a circular saw, timing is everything. On a 12x15, you need at least one cut down the middle both ways. If it’s windy or hot tonight, those shrinkage cracks won't wait for you to get back from the rental shop. Try to get out there the second it’s hard enought to walk on without marring the finish.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required