My present workshop is basically two site huts that were cannibalised and re-erected on minimal footings with a concrete slab floor. The size is approx 6m x 3m although it has a corner removed to accommodate an obstruction. The footings are one or two deep - slightly sloping - large Thermalite type blocks.
I have access to a large number of Thermalite blocks - weathered - for free. Would I be able to safely use these to reconstruct the workshop using the present footings perhaps use piers as appropriate?
PhilC