Hello All
Having just tested my new thermostatic shower out the body jets dont appear to be very good in the flow department. Im thinking its the way I've plumbed them in as the last one in the pipe run has particularly bad flow, the first is acceptable. I have just daisy chained them T'ing off a pipe run (15mm) which I was told should be OK!
What is the best way to plumb these in to see that all jets get equal flow or there abouts. I have a thermostatic mixer shower which is powered by a 3 bar monsoon pump.
TIA Cheers Richard