Is a closed cell foam quote worth it for a 24x24 bonus room over a garage?

Nov 21, 2026 Last reply: 11 hours ago 4 Replies
Saved reading

First reply

ForgeFox485

I'd skip the closed cell foam over a garage, honestly. That space sees big swings in temperature and humidity depending on what's running below you, and it's just not a great fit for foam. The bigger issue is the roof replacement you've got planned in a few years. If you…

Read the full reply

Got a 24x24 unconditioned bonus room above an unheated garage here in New England. Eventually I'll put a mini split up there but for now it's just going to be temporary heat. The problem is hitting R-49 in the sloped roof to meet code, and the roof is framed with 2x8's so there's not a lot of depth to work with. Walls are 2x4's and the floor is 2x10's. The best quote I've gotten so far is around 7k for closed cell foam on the roof and walls, with blown in cellulose in the floor. That's way up from the other quotes I got, which were 3,500 to 4,100 for cellulose and fiberglass but none of those would actually meet code in the rafter bays. For what it's worth the garage below is fully sheet rocked, and the construction including the roof is about 25 years old. I'm planning to replace the roof in 3 to 5 years, but the sheathing looks clean and dry right now and I'll be checking moisture before anything happens. So is the foam route the smart move here given the roof replacement down the road, or am I missing another option that hits R-49 in 2x8's without that price tag? Whatcha got??


I'd skip the closed cell foam over a garage, honestly. That space sees big swings in temperature and humidity depending on what's running below you, and it's just not a great fit for foam. The bigger issue is the roof replacement you've got planned in a few years. If you sheetrock over foam and then have to pull roof decking, you're dealing with compromised foam stuck to everything. Closed cell especially is not forgiving about that. You'd basically be paying $7k now for a headache later.

What I'd do instead is air seal everything and go with Rockwool. It's fire resistant, which matters with a garage underneath, it's got a high R value per inch, and when you do that roof replacement the insulation stays put with no drama. You can pull decking and re-shingle without touching the insulation at all.

The trick to actually hitting code in 2x8s is to fur out the framing. Sister or strap onto the rafters to build a deeper cavity, and do the same on the 2x4 walls to get enough depth for a higher R value batt. It eats a little space in the room but it's cheap lumber and it solves the depth problem honestly instead of fighting it. Since you've got the framing exposed right now anyway, this is the easiest that job will ever be.

One thing I'd stress: call your local building department and ask exactly how they interpret what counts as a wall versus a roof assembly in a room like this. When I finished a similar space we furred the walls out for exactly this reason, and getting their read on it first saved me from guessing wrong on which surfaces needed which R value.

Spray foam quotes and furring-plus-batts quotes often come out closer than people expect once you compare them, so get a quote or two for the Rockwool route with the furring included before assuming the foam number is the real gap it looks like.

First post here so bear with me. I'm slowly finishing my own attic space and reading this thread has been helpful. The furring idea makes sense to me since I've got the same shallow rafter problem, but I'm unsure about one part. When you strap out the 2x4 walls to get deeper cavities, does the building department count those as the same wall assembly, or do they treat the furred layer separately? I keep second guessing wether I'd need to ask them before or after I get a quote.

Following this closely because I'm at the early stage of figuring out my own shallow roof space. One thing I keep coming back to is the idea of thick rigid foam boards screwed to the rafters with the fluffy rock stuff underneath, since that adds insulation value and covers the wood framing that would otherwise leak heat. Seems like it could pair well with the furring plan instead of replacing it.

Question though: when you strap out the rafters to make deeper cavities, does that eat much of the headroom along the sloped part? With a low ceiling up there already I'd worry about bumping my head every time I walk near the walls.

Kind of curious about the timing on the mini split myself. You're ripping into everything anyway with the furring and the insulation work, and it sounds like the room's basically gutted right now. Wouldn't it be easier to get the mini split in before you close up the walls and ceiling, instead of doing temporary heat in a room that's got no R value yet? Might even change what the contractor quotes you for the insulation side if the mini split's already part of the plan. Just seems like doing it backwards means tearing into finished sheetrock twice.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required