So I'm redoing the small bathroom upstairs and putting in one of those PVC composite shower wall kits that mount straight to the studs. Here's the problem: the shower sits right near the bathroom door, like 3 inches of gap between where the wall panel ends and the door opening.
When I pulled the old surround out I found out why the trim always looked a bit off. The door jamb sticks out almost 2 inches past where a normal wall face should be. I'm guessing the person who built it furred the doorway out with extra layers of board to bridge that gap, which worked fine with the old fiberglass but won't cut it now. If I stack material that thick on the shower side, the panel edge will collide with the jamb before the wall face ever lines up.
Options as I see them: pull the jamb and casing and replace it with a shallower one that matches the finished wall, or somehow shim the panels out and accept a chunky trim piece to hide the transition. I'm leaning toward swapping the jamb but I've never pulled one that's tied into a hallway casing on the other side. Anyone dealt with a deep jamb next to a tub or shower? How did you handle the transition into the wet wall?