I'm shortly going to be renting out a property which I'm buying, and before I do I'll be getting the electrics checked over.
Before that - pre-empting the results of the PIR - I think I should probably upgrade the CU to a modern RCD-protected job, even if only a butt-covering exercise (and I'll also first need to install main equipotential bonding twixt gas and water pipes).
I'm aware I may be opening a can of worms by upgrading the CU and then finding the RCD won't set owing to a hitherto undetected issue with the existing wiring, but I'm accepting that. I'm not intending to touch the existing wiring as such, unless necessary - it looks OK - ie I'm not into adding any new circuits etc.
I would be very grateful for advice as to what specification of CU to go for, especially as I'm not familar with the 17th edn regs.
Existing syatem seems to have 1 lighting circuit and 1 ring main (not sure why there are apparently 3 circuit breakers though?):
What would be most appropriate as a like-for-like replacement - a 2-way (3-way if needed?) CU, with full RCD protection? Or split-load with the lights not on RCD? Something else?
Here's the current configuration, which no doubt will prompt other questions!:
Thanks David