I need to replace a couple of overhead cable runs to sheds, one is about
110mm and the others are in a daisy chain of 3 sheds with a maximum distance (between the ends of the chain) of about 50m. Each building (including the house) has an earth rod connected to the Neutral. I plan to bury ducting to allow for the possible need to pull other cables (such as alarm) through later - the question is whether I can use T&E and whether there are any objections to cables sharing the ducting?