Got transferred to Shell when my supplier failed. They keep on nagging me to get smart meters fitted, so OK. I have to read them every month, and the gas one in the cellar tricky to read due to being sort of side on.
A charming young man arrived to fit them yesterday.
The existing gas meter not fitted correctly, he said. Has two flexible pipes back to back to connect to the incoming iron barrel. Seems you are only allowed one. Connection to my internal copper OK. But because it is in an awkward place he took pics and would need advice about how to proceed. It having been fitted in an awkward place why I wanted to change it in the first place.
On to the electrics. These are at the top of the cellar stairs so easy to get at. As original, looked a mess. So when fitting a split load CU some years ago, I lined the brick wall with a floor to ceiling plywood panel, and everything mounted on that, with all cabling behind. CU at the top, meter (modern digital) below that, and alarm control box under that. And seems not enough space between CU and alarm for the standard smart meter. Although it can be split into two bits, mounted side by side, and there would be space.
But then he looked at the riser fuse in the cellar to disconnect. And decided it was too old and showed signs of overload. (The original when I moved in some 40 years ago was cast iron, and had been changed sometime after that, so not ancient. Or rather not so ancient as the main cable which looks original so well pre-war.)
So he phoned the power company with a code something. Meaning urgent attention needed. An hour or so later - about 1730 - the power man arrived. Tested things including the earth and said nothing wrong with it. Just not the latest header. Everything was tight and no signs of overloading. But would arrange for it to be changed.
He also asked why I had earth rods. (The reason is the then power supplier wanted £600 to supply their earth. But didn't tell him that) I just said it was how it was done. So he installed an earth to the outside of the supply cable which I'd guess is armoured. Only took him minutes. But didn't connect it to the adjacent earth block. As he said just linking it to the existing earth might cause RCD problems.
Has a phone call this morning. They will come to fit a new riser next Tuesday.
No idea when they'll fit the smart meters.