Is it permissible to have a new CU on a PME system ?
Friend wants to replace CU with a split load unit so he can separate power and light circuits, and/but he has a PME system.
Thanks, Nick
Is it permissible to have a new CU on a PME system ?
Friend wants to replace CU with a split load unit so he can separate power and light circuits, and/but he has a PME system.
Thanks, Nick
Yes, it's quite normal.
If it werent, those of us on PME would still be using switch fuses and waxed paper cable.
NT
Have something to add? Share your thoughts — no account required.
Ask the community — no account required