Read SI 2006 on ODPM. There are notifiable & non-notifiable works. >
> Notifiable works...
> - New final circuit
> - New SWA to shed or garage
> - Extending final circuit in kitchen & bathroom
> - Changing a CU re enclosure and protective devices (CPD)
> - etc
>
> NON-Notifiable...
> - Maintenance operations even in special locations or connected with > them
> - Extending any circuit not in a special location (extending power
> circuits, light circuits)
> - Replacing a RCD, RCBO (eg, no trip on test button)
> - Replacing a shower
> - Replacing a SWA cable to a shed
> - Replacing any circuit cable (circuit defined as supplied by a CPD)
> - Changing an enclosure (including a CU enclosure, but not all CPD)
> - Extending a porch, shed, garage circuit is not a special location > - etc >
> So a "rewire" may not require much notification at all.
> Probably the CU, but unless you are gutting the house you can do bit
> by bit - 20A radials per room are a good thing here because you can do
> a room at a time re mess / time / cost.
Where can I qualify the above info, as I've replaced all the circuits in my house and had an electrician replace the CU and test all circuits. The problem is that we are selling the house and the solicitor is requesting a compliance certificate for the electrical works but all I have is the paperwork for the CU replacement and test. I'm not sure what I should now do?
Any advice appreciated