The gf's boiler was condemned when it was serviced.



First of all the asbestos test "needs" to be done.



Council "We need to have an asbestos test done" Gf "Why?" Council "In case there is any asbestos" Gf "There was no asbestos when you did the last test 13 years ago" Council "You still need to have one done" Gf "Why?" Council "I just has to be done" Gf "If it had no asbestos 13 years ago it will not have any now" Council "It's the law"



Gf then points out that she has had no hot water or central heating



Council then send her a fan heater and tell her to use the immersion heater.



Gf points out that there is no flex between the immersion switch and the immersion heater.



Council sends out an electrician to sort this out.



Gf then calls me to see if the council electrician can have a bit of heat resistant flex from my van as he has not got any.



Three days later a smug bastard turns up in an Audi to take asbestos samples and looks at her existing asbestos report that says there is no asbestos.



Council fail to call gf to say what is happening with a replacement boiler.



Gf calls council and is told that it will be fitted before the 30th May.


I know that it's about her time of the month and some poor sod at the council is going to get a loud phone call on Monday morning.


My local councillor will say anything you want him to "within reason" as long as you cross his palm with silver.

Which council is this? And what does your/her local councillor have to say for themselves?

Folding portraits of Her Majesty, I suspect, more like :-)

I strongly suspect this is the result of outsourcing. It happening everywhere and there are so many little companies sub contracted to do bits and pieces and the old council data is long lost. Corporate amnesia has set in as the council helpdesk people are on minimum term contracts of 3 months and likely not to be there when the s*it hits the fan in any case. Brian

That's where you went wrong. Shouldn't have provided the report and should have demanded a full survey.

Brilliant idea till that finds some accessible Asbestos that was missed in previous removal exercise and inspections. Then Adams GF finds herself relocated in temporary accommodation for a few weeks if not longer while the issue is dealt with.

GH

Feasibility studies, reports, excessive checking it all seems to have produced a whole industry of bean counters that seem to suck money away from the actual projects themselves. Nearby we have a by pass with National Speed limit applied on one side is a village, on the other side is the train station many use daily. Currently the pedestrian crossing is at ground level the only saving grace being that it is near a roundabout so traffic is slowing down at least on one side although accelerating on the other. Crossing the four lanes is a most hazardous adventure and the villagers have been requesting a safer alternative for years. Last year the local council announced a feasibility study, and unless it was a typo in the local press, at a cost of £300,000. You could build most of a pedestrian bridge for that sort of money!

I believe Leeds have spent in the order of £130 million in proposals for a mass transit system all of which have been rejected and still have nothing to show for it. I know sometimes you have to spend some money to find out if a project is viable but it seems these days the sums are mind boggling.

Richard

I was anticipating that. So pleased it went to form.

Out of interest, why didn't you just fix it for her?

I would have had the council not already sent out their electrician. He waited 20 minutes for me to get home from work.

If a bridge was to be built,no-one would use it. Too idle to climb the stairs.

They'd prefer to dart through the traffic.