Right, decision taken, I'm going to change the CU before christmas for a nice shiny new one that will have plenty of spare ways for those circuits that I won't be able to install now, and with RCBO protection for the external circuits & kitchen along with a new non-RCBO circuit for fridges, boiler & freezers.
As larger enclosures don't cost that much more than smaller ones it makes sense to put the largest one that will fit in there.
I know the distance between the meter and the edge of the mounting board (where the current CU sits), but in determining the maximum size of CU that will fit in there is there a minimum distance between the edge of the CU and the meter that must be observed (and indeed a minimum distance between the edge of the CU and the edge of the mounting board)?
I also plan to mount a 2-unit enclosure with a 100A main switch in it to act as an isolator - this would have to be mounted below the meter. All tails, cables, etc will be routed in beautiful workman-like fashion, but any problems with this spatial arrangement?