We're having the kitchen done and the ceiling's been taken down.
2/3rds of the kitchen is in the house proper (i.e. bathroom above it) with 1/3 being an "extension" (35* roof) built at the time of construction of the house in 1984.
There was some insulation in that roof space laid over the wires/ pipes. There is access to the roof void, but you'd have to be pretty skinny to work up there.
I've taken that insulation out as it was *really* crappy. Having read this group, I see that insulation (in lofts anyway) should be laid under wires. However, as I said, you're not going to have much work done up in the roof space without taking the ceiling down as part of a total kitchen refit.
Is it alright to lay over the wires/pipes in this situation? Certainly it has been appreciated by our electrician/plumber, but that's because we've had the ceiling down. Of course I will leave the ~9" clearance over the light fittings per our electrician's instructions (not sure how I'll do that, but I'll muddle through :) ).
As the ceiling's going up again tomorrow, any advice would be appreciated.