I read on a concrete product manufacturer's website that unskilled labour can be used to install these floors. Is that really true?
I need to raise the level of a pond filter house (7' 3" X 6' 3") by about 10". Is this a quick and cost effective way of achieving this?
Cheers!
Jeff To email me just take the MICK out of my addy!