I had a similar job done on a kitchen line that was suffering from pitting and scale buildup. My old galvanized run was prolly around twenty years old and had a few bad spots near the drain stub. The plumber tried a threaded coupling, which I totally thought was a bad idea…

Read the full reply

When you are dealing with seriously corroded galvanized steel, temporary fixes using couplings and clamps are absolutely not appropriate for a pressurized water line. Even if the original valve was failing, patching the leak with flexible tubing simply shifts the problem; the internal pitting is going to compromise the entire run eventually, and you risk a massive failure down the road. This is not a scenario for short-term solutions. My experience suggests that if a section of pipe is nearing the end of its life, the only correct path is a full replacement. If the stub pipe is too deteriorated to accept a standard replacement coupling, then the plumber should have been cutting and threading back to the last stable point, or ideally, using a proper fitting that interfaces with the existing material, but cutting is usually best.



If a contractor causes the damage while doing unrelated work, hold firm on accountability. The cost of the proper repair, not just the patch, should be covered by them, as the damage occurred during their service call. Document everything, including the specific type of repair they implemented and why you believe it is inadequate for sustained use.


I had a similar job done on a kitchen line that was suffering from pitting and scale buildup. My old galvanized run was prolly around twenty years old and had a few bad spots near the drain stub. The plumber tried a threaded coupling, which I totally thought was a bad idea based on all this discussion about corrosion and pressure. He insisted it was fine because the internal pressure wasn't that high. I actually spent a couple of hours watching him work. It looked proffesional enough, but I was worried about the longevity. I eventually had to pay him for the whole thing. We ended up going with a full switch to copper right at the wall so we could get rid of that entire failing section, which cost me a lot more. Even with the coupling, I think the new fittings might just be the next problem down the line. For that specific section, replacing the whole run of ten feet with PEX felt like the only responsible move for the house's plumbing integrity.

I'm with the sentiment that these temporary fixes on pitted galvanized steel just lead to a big mess later. I recently replaced a full 12-foot run of line at a client's house, and even though the pressure wasn't astronomical, the internal corrosion was definitly compromised. The initial plumber used a coupling, but the pipe wall thickness was allready below acceptable standards, which is why full replacement is the only safe bet. Copper gives us the peace of mind that a threaded coupling just can't provide when the base material is that weak.

I've had a similar issue, but it wasn't galvanized; we were dealing with really old copper line that was failing at the joints. The internal scale buildup was the issue, not the pipe itself, which made it confusing. The contractor attempted to replace the connections using these mechanical compression fittings. Even though the pipes themselves looked solid, those old soldered spots were definitely compromised. I guess I am just wondering if those types of fixes are actually reliable even if the main runs are still okay.

I dealt with a similar situation where a slow drip was coming from the connection point under my kitchen sink. The previous guy just clipped a small piece of plastic over the leak and left. I figured if it was dripping there, the whole shut off valve was likely shot inside the wall. I ended up replacing the entire valve assembly myself rather than trying to patch the leak. It took a bit more labor, but I wanted to avoid the mess of a sudden blowout later. Always replace the full fixture instead of just patching the line.