Sold on 10ft. Thanks all for the great responses.
My new plan is to lay 2 courses of 8" concrete block and then use standard 8ft studs and work with 8ft sections of wall so I can tilt them up myself. I will use morter to lay the block, screen after first course and then fill the second course with concrete (or morter?) with j bolts. Do I need to fill each block on the second course? or just the ones with the jbolts?