About 40 years ago at work we did this as a temporary test of a few pieces of equipment. We had some small
220V blowers we needed to test, on a short term basis. So we wired a setup as you described and used it. It worked quite well for what we were doing. I don't think we had more than a dozen units to test, and when we were through we took it apart.Bill Gill