Honestly, from the way you describe it, that setup would fail inspection in my area without question. A long exhaust run going diagonally across open space instead of following the wall, loose wiring just dangling there, boxes screwed to studs with nothing finished off, none of that flies with a city or county inspector. Which leads me to the bigger question: did anyone pull a permit for this? Because if a permit had been pulled, an inspector would have to sign off before the job is considered done, and this doesn't look like anything that would get a sign-off. My guess is no permit was ever filed, which is a whole separate problem on top of the workmanship itself. The exhaust routing is the part that jumps out at me. Venting has to be done to spec for the specific furnace, and a lazy diagonal run across a room is not how a competent crew leaves things. Same with the electrical. Even in an unfinished space, wiring and boxes get secured and roughed in properly. Loose conductors hanging around next to a gas appliance is not a 'we'll tidy that later' situation, or at least it shouldn't be if they were planning to call it done today.
As for the gas line coming down the wall, that alone doesn't tell you much either way, but combined with everything else you're describing, the whole install reads like a hack job to me. When mine went in, everything was either strapped, supported, or capped neatly by the time the crew left, and that's the baseline you should expect. If it were me, I'd be on the phone with the contractor first thing tomorrow asking straight up whether a permit was pulled and when their inspection is scheduled. But based on what you've laid out, I wouldn't fight to salvage this. I'd have them pull the whole system out and get a reputable company in to do it properly. You're about to live with this equipment for fifteen-plus years, and the difference between a clean install and a sloppy one shows up in every inspection, service call, and insurance question down the road.