I decided to go under the surface of the deck myself before signing off on anything. Looking at the framing after years of weather exposure, I was worried about trying to salvage the old joists for the TimberTech install. It’s definatly not up to code, expecially with all the moisture damage and the visible deterioration of the wood fibers.
I spent the better part of a Saturday assessing the structural integrity. Once you see the amount of decay and how compromised the load-bearing connections are, you realize that simply bolting down new composite decking won't solve the underlying issue. The builder was right; the frame needs to be retired.
I ended up planning a full frame replacement to ensure everything is safe and up to current building standards. Definitely make sure you wear proper safety gear when you are cutting structural lumber near the ground, especially during a replacement project. The new setup should be much more robust.