I've run into a wierd spot with a house flip project. I came out with two seprate line items becasue the client wanted to see how the budget felt for each phase before committing to both. Scope one was just replacing the kitchen backsplash and updating the trim, around 1200. Scope two was doing the bathroom remodel, wich is much bigger, maybe 5000. I broke it down so he could approve the first chunk without feeling locked into the whole thing. He signed off on Scope one and was thrilled with the price. Then, when I presented the Scope two estimate last week, he started getting confused. He kept thinking he'd agreed to somthing like a total project cost, rather than seeing them as separate phases. He basicly thought he was agreeing to the $1200 total, not the full $6200 of labor across the whole job.
I tried to show him the document and explain the scope breakdown again. He said he just skipped reading that section. It makes me feel awkward because he hasn't signed anything for the second half yet, and I don't want to lose the job, but I also don't want to feel like I misled him on the initial paperwork.