I have a piece of SWA emerging from a wooden post into the back of a plastic outdoor socket. How should I terminate the SWA? This is only a temporary setup (I'll be swapping out the socket someyear) but I need it to pass Part P as a new circuit installation. I'm not planning on earthing the armour at this end (separate earth core), that'll be terminated at the other end, so it's just about properly dealing with the armour.
If I use a traditional SWA gland with boot it would mean drilling a large hole in the post, which I'd rather avoid as it would be unsightly once removed. I could I suppose terminate the SWA at the bottom of a box at the rear of the post and then run bare cores through the post, but I'd rather not do that (hard to protect from water ingress). Doing that at the front would be both unsightly and have an awkward bend radius.
The plastic socket is only supposed to sit a couple of mm off the surface. I suppose I could add a chunky wooden block behind to hide a gland in, but that would be ugly.
Presumably SWA coming through a wall and terminating inside a box must not be uncommon? How's it normally done?
Cheers, Theo