Blood, sweat and team work is the usual installation method.
Blood, sweat and team work is the usual installation method.
A team of 5 or 6 usually pull in 95mm 4 core swa.
Indeed, but thats a very different thing to the whole exercise being pointless
I thought there was lighting on another 2 core circuit. If thats retained along with the new circuits, lighting isnt lost from a trip. Losing all the lighting is what should be avoided.
NT