new brickwork query

May 24, 2005 3 Replies

Hi group



I am building cement & brick foundations for decking.



How long after building the foundations must I wait, before drilling and inserting load bearing bolts, to attach the decking.



i.e. - is it strong enough as soon as it is dry, or does it get stronger with age?



thanks, Ian


At least 48 hours in these temperatures. A week might be better.

I think full strength is reached in 30 days. It's an exponential process so half strength is reached considerably sooner than 15 days, I think it's more like 4 days.

Andy.