We wanted to get a megaflo system and the 1st quote we got from our builder was =A316,000 for supply and fit of boiler and megaflo. Given that the mega system and boiler we want are no more than =A32,500, the plumber wants to charge =A313,500 for his labour costs. This is for a 4 bed house with 2 bathrooms so not exactly a hotel. This sounds excessive and the guy is taking the proverbial you know what.
What are realistic costs I should be estimating for?=20