How long should I wait before I can get onto a 5 inch thick slab of newly laid concrete.
Its not raining but its been plastic sheeted just incase, and there is no imminent frost.
Would a week be OK, as I want to remove the shuttering and get the soil and grass laid around it. And then a shed put ontop of it.