Hi,
Just had a 9m2 conservatory built. Concrete base was laid a week befor Xmas and glass installed about 7 days ago. So essentially it's been ope to the elements until v recently.
Am considering laying electric underfloor mat heating and the potentially Amtico floor. Have been advised that concrete takes 0.25 per week to completely dry out and I should wait approx 8 weeks befor laying anything
Is this advice valid ?
Many thank
-- Tim Kedwards