Hi,
I'm planning to dig a fairly shallow trench for some MDPE pipe, and would like to hear any tips on how to go about it, or how long it should take to dig 40m of trench.
It's not going to be that deep as it's in a well sheltered low lying area, I was thinking of cutting down a cheap spade to dig a narrower trench, or would this make it trickier to get the earth out?
TIA, Pete.