Ah, I see. Google at work - not.

This is unlikely as fittings ar almost entirely plasterboard backboxes.

That's right. You put in two of them, wire loop through the proper position to the TwoJags position, then place a fillet of plasterboard flush in the proper position until it is needed. Snip the loop and plaster in the silly position after final inspection.

In fact some people are even more blatant and just put dummy panels there. I haven't yet seen 'double decker' switches or sockets but I expect somebody will soon.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required