Can someone check my swing joint repair before I backfill?

Nov 25, 2026 Last reply: 2 hours ago 6 Replies
Saved reading

First reply

OakKaren43

Before you backfill anything, I'd cut that whole swing joint out and start over with pressure-rated fittings. From the way you describe it, those elbows look like DWV drain fittings, the purple primer kind you'd find on a sink or shower drain. Those are not rated to hold line…

Read the full reply

So our water line let go way back on our property, deep in the trees on a long run. Turns out the previous owners ran it right up against a big stone, and a root snuck in between the two. All that pressure pushing on a coupler eventually snapped the pipe clean in half. There's also a slight elevation difference between the inlet and outlet, maybe 1/2 inch if I had to guess. I slapped a swing joint on there to handle the offset. A few PVC elbows with short segments between them, all primed purple. It seems to be doing its job so far, but there's standing muddy water sitting in the bottom of the hole, which makes me a little nervous about what I can't see down there.



My plan is to leave it a week and backfill if it holds. Is that reasonable, or shoud I be doing somethig diffrent before I bury it? Also, what's the right thing to backfill with? I was thinking sand with a layer of something on top, but honestly I'm guessing at this point.


Before you backfill anything, I'd cut that whole swing joint out and start over with pressure-rated fittings. From the way you describe it, those elbows look like DWV drain fittings, the purple primer kind you'd find on a sink or shower drain. Those are not rated to hold line pressure. They'll hold for a while, maybe even a week, which is exactly what makes them sneaky. A pressurized service line is a completly different animal than a drain, and a fitting letting go under ground is a much worse day than the one you just had. Swap in pressure-rated elbows and couplers, the stuff actually stamped for water service, and build your offset joint out of those instead. Then let it sit and watch it.

The standing muddy water in the hole is annoying but not the end of the world. It does mean you can't fully see what's going on at the bottom of your repair, which is another reason not to bury it untill you're confident in the fittings themselves. I'd want the joint sitting proud of the water when I pressure test it, personally. On your week-long wait, that's a fine instinct, just do it after the refit with real pressure fittings, not with the drain fittings currently in the ground.

As for backfill, your instinct about sand and a layer on top is in the right direction. The main goal is to keep sharp rocks and chunks away from direct contact with the pipe, especially given that a stone is what helped kill this line the first time. Something soft packed around the pipe, then your native material on top once you've got cover over it. One thing I'd be curious about: is there any way to reroute that run a foot or two around that big stone? Root or not, that rock is going to stay right there pressing on whatever pipe you put next to it.

I'm following this one closely because my own yard has a water pipe running through trees too, and reading about yours snapping in half makes me want to go look at mine. The rock part is what sticks with me. Like the other reply said, that stone isn't moving, so putting the new pipe right back against it seems like asking for round two of the same problem.

One thing I keep wondering while reading: when you do the week of watching it, is the water actually on and pushing through the whole time? Because with muddy water sitting in the hole, a slow drip at the joints would be really easy to miss down there.

Curious about the root itself, did you rip that thing out when the pipe snapped? Roots chase moisture, and a leaky joint is basically a dinner bell for them, so if any of it's still hanging around down there it might come right back for the new pipe. Especially with it being such a long run out in the trees, there's probably plenty more roots nearby just waiting. Feels like the root's worth a look before anything gets buried.

One thing I keep coming back to is how you described the failure, with all that pressure pushing on a coupler until it snapped. So on your new joint, is the coupler sitting somewhere it takes no side load, or is it right in the bend where the offset change happens? To me the whole point of a swing joint is that the couplers sit in the straight runs between the elbows and the elbows take the geometry, not the glued slip joints taking a bending moment like the old one did. With only a half inch or so of offset to absorb, that seems achievable, but I'd want to look at exactly where the coupler ended up before covering anything.

Your sand plan is the one thing in this whole thread that hasn't changed since back when we did everything by hand and a shovel. Soft stuff packed around the pipe, no sharp chunks touching it, then the native dirt on top. That's the same way it was always done and it still holds up. As for the half inch offset, don't lose sleep over that, a swing joint is built to eat that kind of difference all day. One thing I'd want to know before the week is up: how deep is this line sitting? Out in the trees like that it matters for what the frost does to it, and it changes what you want over that sand layer.

Update: okay, you all changed my mind on the fittings. If those elbows are really the drain type and not rated for pressure, I'd rather cut it all out now than dig it back up later. One question though, when I rebuild this, should I reroute the line so it's not sitting against that stone again, or just keep more clearance around it?

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required