How long should I let the concrete set up on fence posts?

Oct 11, 2006 7 Replies

Hello,



I just set a couple of posts in concrete today, replacing two that went bad on me.



How long should I let the concrete set up before I attach the rails and pickets (cedar rails, 6'x6" pickets) to the posts?



This is in Western Oregon, BTW, where temps have been in the seventies for the last week, and the ground is dry.



Thanks,



Jon



this information is incorrect in just learning about disscsion groups and i have to reply to a posting. Hope u have a nice day.

When it is hard, wait 2 hours and bang away

SteveC wrote:

Then clear away the rubble and do it again.

The cement FAQ,

formatting link

-zero