Poring a pad for a double wide home compact gavel rebar on a two foot grid pattern what is the minimum time after the pad is poured till I can safely set double wide
Cure time on a pad
Oct 13, 2016
2 Replies
At least a week. You will be at well over 90% in a month. Keep it wet.
Larry,
The mixture, thickness, and temperature are important. At a guess, your pad will reach 70% strength in about 7 days.
Dave M.