Wish somebody had told me this years ago, so here it goes. When we gutted our kitchen, I made a point of walking the job every evening after the crew left. Sounds paranoid, but it caught real stuff. Take photos of every box before it gets covered, note where wires are supposed to land, and check that boxes recessed into tile or stone sit flush with the finished surface, not buried half an inch behind it.
The rough-in stage is your last cheap chance to fix things. Once the backsplash is tiled and grouted, moving an outlet means cutting tile, and that gets ugly fast. I asked the electrician to leave every box capped and labeled, and to walk me thru what each one fed. A guy who knows his stuff will happily explain it. A guy who gets defensive is telling you something. Also, ask to see the permit and the inspection sticker. If your GC waves that off with 'we don't bother with permits for this,' that's your red flag right there. The good contractor we finally hired pulled the permit without me even asking, and the inspector caught one loose connection before the wall closed up. Cheap fix at that stage. woud've been a headache later.