What can you do from 9 to 5?

Jun 04, 2011 4 Replies

formatting link
How about building a barn!


How long did the foundation take? Does it have one? just curious

formatting link
How about building a barn!

In a pole barn, (as mentioned in the video description) the vertical POLES (usually 6x6 or 8x8 treated lumber) are set in concrete about 36" deep. (depending on local code) A poured concrete floor is optional.

In a pole barn, (as mentioned in the video description) the vertical POLES (usually 6x6 or 8x8 treated lumber) are set in concrete about 36" deep. (depending on local code) A poured concrete floor is optional.

jloomis wrote the following:

You wouldn't have learned anything from the sound. It was just music.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required