European grid very tight...

2300 6th still on 5th 1830 ish... But it's Saturday so no one but the chickens are in.

And my page scraper script works nicely. B-)

Dungeness B - 05 Dec 2014 18.34hrs Generation: 05 Dec 2014 13.30hrs Reactor 22 - May-2015 Turbine Generator 22 - In service - 331 MW Load raise held to maintain fuel within operating limits

Hartlepool - 05 Dec 2014 18.34hrs Generation: 05 Dec 2014 12.30hrs Reactor 1 - June-2017 Turbine Generator 1 - In service - 445 MW Raising load following boiler inspections Reactor 2 - Jan-2016 Turbine Generator 2 - In service - 455 MW Optimising load following boiler inspections

Heysham 1 - 05 Dec 2014 18.35hrs Generation: 05 Dec 2014 12.30hrs Reactor 1 - Jun-2016 Turbine Generator 1 - Offline - -5 MW Planned - Shut down for boiler inspections - 31-Dec-14 Reactor 2 - Apr-2015 Turbine Generator 2 - In service - 441 MW Optimising load following boiler inspections

Sizewell B - 05 Dec 2014 18.35hrs Generation: 05 Dec 2014 12.30hrs Reactor 1 - On outage Turbine Generator 1 - Offline - -9 MW Planned - Statutory/refuelling outage - 09-Dec-14 Turbine Generator 2 - In service - 547 MW Statutory/refuelling outage

Reply to
Dave Liquorice
Loading thread data ...

Pigasus?

Reply to
Steve B

Ah - wait 'til he flies too close to a windmill.

Reply to
PeterC