I have torn my bathroom down to the joists and subfloor. Which order is SOP for installing tub, tile walls and tile floor?
I'd like to do the tile wall first, but something tells me that the tub should go in prior so I can install the wall backerboard and tile so it doesn't rest on the edge of the tub. Any advice would be hugely appreciated.