I'm starting work on my bathroom soon and the plan is to remove the skirting board and lay floor tiles and then tiles the walls right down onto the floor tiles. However, I'm also planning to get the toilet and basin replaced and I'm not sure on the order of things. Should I get the toilet and basin replaced first and then tile around them or do all the floor tiling first and then fix the toilet and basin to the new tiling?
Thanks,
Chris.