Many readily available but start with
Cement mortar isn’t breathable, and as it degrades, it leaves the stones vulnerable to damage from trapped moisture. In September 2021, conservators replaced this with lime mortar to keep water out as well as to allow any water that does get in to escape."
...
Also mentions that in the 1958-9 project "One of the large sarsens of the inner horseshoe was set in concrete and a large hollow at its base infilled."
Do you have any references for that distinction between building and erecting? I ask as it is at odds with OED where
"build" means "To construct, put up, erect (a house or other dwelling or building).... and
"erect" means "To set up (a building, statue, framework, etc.); to rear, build"